| key performance indicator (kpi) | an indicator is a statistic used to measure something. a key performance indicator it is an accurate, or particularly good, measure of a particular set of characteristics. |
| kilowatt hour | an energy unit equivalent to 1000 watts used for 1 hour. it might be referred to as a unit of electricity = 1 kwh. |
| kilowatt-hours peak (kwp) | the maximum amount of power a photovoltaic module is able to generate under standard test conditions. |
| kyoto protocol | is an amendment to the united nations framework convention on climate change, assigning mandatory targets for the reduction of greenhouse gas emissions to signatory nations. |
All Site Content ©2009 Sustainable Building Resource
All sustainable building encyclopedia content is released under the GNU FDL free document content license.
Built and supported by
Cardiff Web Design,Search Engine Optimisation
and good cause fanatics. Clear Intent